Thank you for contacting us about your home elevation project! A successful project starts at the very beginning and this is where most projects de-rail because there are a lot of “contractors” who do not have a process and they allow the homeowner to push them into a schedule that they cannot possibly meet. To avoid that, we have a proven process we follow. Below is our process for getting started:

1
Visit the site to review conditions, discuss goals and offer ideas. Free 30 minute consultation.
2
Enter into a Project Development Agreement – This stage includes on-site measurements, photos, possible site visit with architect and/or engineer. Based on the approved bottom level design and notes we have taken from our prior discussions with you about your finishes, we will write a Scope of Work. From all of that, we are now able to develop accurate costs for the job. The development fee is based on what we see when we visit the site (and the size of the project) and will range from as little as $1,000 to $5,000.
3
Present drawings, including 3D renderings of the job, bottom floor plan that includes electrical, along with written scope and pricing.
4
Make changes as required by you (if any), adjust price if needed
5
Enter into contract, finalize plans, apply for permit, etc.
6
Make selections of all items needed
7
Schedule production
8
Hold pre-construction conference
9
Start the job!